No. 15 (2011): GFS
RICERCJIS

A technologic water corridor

PATRIZIO NUSSIO
Team Progettazione Impianti Tecnologici Autovie Venete, Centro Servizi Palmanova, 33050 Bagnaria
TOMMASO ZARATIN
Team Progettazione Impianti Tecnologici Autovie Venete, Centro Servizi Palmanova, 33050 Bagnaria

Peraulis clâf

  • Optical network,
  • stations,
  • oil skimmer,
  • optic fiber,
  • SCADA,
  • PLC master
  • ...More
    Less

Cemût citâ

[1]
NUSSIO, P. and ZARATIN, T. 2011. A technologic water corridor. Gjornâl Furlan des Siencis - Friulian Journal of Science. 15, 15 (Jan. 2011), 51–58.

Ristret

A modern methodology has been developed by a team of Autovie Venete technicians and engineers in order to monitor a motorway wastewater purification system and ensure its regular functioning. Initially designed for “section 28” (Sacile Ovest- Godega di Sant’Urbano) of the A28 motorway conecting Portogruaro (Venezia) to Conegliano (Treviso), the purification and monitoring system was later expanded to include “section 29” between Godega di Sant’Urbano and the A27 junction near Conegliano. Completely designed and developed by Autovie Venete Systems Engineering Department, the system has taken one year of work and an investment of € 650,000. The added benefit of this system lies in the fact that it is possible to further strengthen the network infrastructure without making adjustments to its system architecture.